We are proud to have partnered with some of the leading global utilities to implement some of the most advanced Smart Grid projects. Our operational systems have saved our customers over two hundred million dollars, improved customer service and enhanced reliability. We have reduced the cost and time to interconnect to the network for hundreds of DER and our case studies are providing the blueprint for a flexible and transactive grid of the future. 

Flexible Interconnections

Working with AVANGRID subsidiaries NYSEG and RG&E, as part of one of the first Reforming the Energy Vision (REV) demonstration projects to integrate increasing quantities of renewable generation with the distribution system, we deployed ANM Strata as an alternative to network upgrades

Find out more

Microgrid

We delivered ANM Strata to deliver a mix of economic dispatch and real-time control of demand, energy storage and generation. Creating flexible system operator capability enabled SSE Networks to add a further 8.5 MW of renewable generation to the islands, displacing diesel generation and taking renewables to over 40% of the energy mix.

Find out more

Fleet Energy Monitoring

ANM Strata provided high-resolution monitoring of distributed and renewable generation and load. We also implemented peak load management using EV charging, demand aggregators and direct generation control to create savings of ~£50m.

Find out more

Congestion Management

Operational 24x7x365 for over 9 years, ANM Strata was installed to increase the hosting capacity for renewables. We enabled SSE Networks to add a further 26MW of renewable generation to a previously constrained network. The project delivered £30m of savings and the let islands becoming a net exporter of renewable energy over the course of a year.

Find out more

Constraint Management

UKPN deployed ANM Strata across a region of their network to deliver managed hosting capacity and increase renewable connections. Over 100 MWs of renewable projects have since connected saving tens of £ms in avoided grid augmentation.

 

Find out more

Stay Informed

My name is .
I am a
  • Energy Asset Operator
  • System Operator
  • Distribution Utility
  • Regulator
  • Government Body
  • Trade Association
  • Journalist
  • Other
from
  • United Kingdom
  • North America
  • Europe
  • India
  • Asia
  • Australia
  • Other

and my email address is