Case Study: H2020 (Optimised)

OIP
circle-exclamation-solid

Problem

As part of the EU-funded Horizon 2020 project, Laing O’Rourke required a real-time software platform to be integrated into their smart factory in order to visualize live and historic power consumption and improve energy efficiency.

circle-check-solid

Solution

The Cirrus Flex software platform deployed at each factory to perform local site integration and optimization; each factory was integrated with a private cloud instance of Cirrus Flex for aggregated demand side response enablement.

list-check-solid

Result

Laing O’Rourke obtained complete visibility of energy consumption across sites including carbon impacts, they identified energy efficiency opportunities, enabled their factories to participate in demand response markets and demonstrate the control mechanisms required to implement DER additions at current sites within connection agreements.

This project has shown the important role industrial energy users can play in the changing energy landscape. Utilising SGS products to manage and optimise our energy consuming processes has highlighted future savings we can make across our operations and the value of future DER and DSR developments.

Dr Graham Herries
OPTIMISED Project Coordinator, Laing O'Rourke