Problem
Avangrid was receiving customer feedback related to the high cost and timescale of DER interconnection being driven by the need for grid upgrades.
![circle-check-solid circle-check-solid](https://8881677.fs1.hubspotusercontent-na1.net/hub/8881677/hubfs/circle-check-solid.gif?width=100&height=100&name=circle-check-solid.gif)
Solution
Using Strata Grid, Avangrid introduced flexible interconnection methods demonstrated and proven in the UK. Customer interconnection agreements were amended to incorporate the fast-acting, autonomous control methods used by Strata Grid to minimise curtailment actions.
![list-check-solid list-check-solid](https://8881677.fs1.hubspotusercontent-na1.net/hub/8881677/hubfs/list-check-solid.gif?width=118&height=100&name=list-check-solid.gif)
Result
The project demonstrated the capability of Strata Grid to double grid hosting capacity and reduce customer need for capital expenditure.