Case Study: UK Power Networks Active Response

UKPN Active Response

The way energy has flowed changed with the clean energy revolution, and now Distributed Network Operators (DNOs) are seeking to transition to Distributed System Operators (DSOs) to ensure customer needs are met, and that reliability is maintained, while reducing the reliance on fossil fuels and decarbonising the electricity system at the least possible cost to customers. UKPN needed a way to move available capacity around the distribution system to where it was most needed, acting either through scheduled or real-time adjustments. Such as moving untapped charging energy from residential areas to cities and factories during the day.

To learn more download our case study. 

UK-Power-Networks-Logo

Download case study

We are creating a platform for the network of the future and we’re taking it further and faster than anyone in the world has done before. This business-as-usual project demonstrates that innovation is truly embedded in our business. Having ANM integrated into our entire network control system is going to open the door to an almost limitless range of smart grid applications.

Sotiris Georgiopoulos 
Director of Distribution System Operator at UK Power Networks

 

More Information

UKPN: Project Data

Close menu